• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • About Us
  • Videos
    • Featured Video
    • Foodie Friday
    • Monthly ReCap
  • Online E-Editions
    • 2025
    • 2024
    • 2023
    • 2022
    • 2021
    • 2020
    • 2019
    • 2018
    • 2017
    • 2016
    • 2015
    • 2014
  • Social Media
    • Facebook
    • Twitter
    • Instagram
  • Advertising
  • Local Jobs
  • Puzzles & Games
  • Circulation Request

The Laker/Lutz News

Serving Pasco since 1981/Serving Lutz since 1964

  • Home
  • News
    • Land O’ Lakes
    • Lutz
    • Wesley Chapel/New Tampa
    • Zephyrhills/East Pasco
    • Business Digest
    • Senior Parks
    • Nature Notes
    • Featured Stories
    • Photos of the Week
    • Reasons To Smile
  • Sports
    • Land O’ Lakes
    • Lutz
    • Wesley Chapel/New Tampa
    • Zephyrhills and East Pasco
    • Check This Out
  • Education
  • Pets/Wildlife
  • Health
    • Health Events
    • Health News
  • What’s Happening
  • Sponsored Content
    • Closer Look
  • Homes
  • Obits
  • Public Notices
    • Browse Notices
    • Place Notices

Zephyrhills opens doors to new City Hall

December 5, 2018 By Kevin Weiss

The brand-new Zephyrhills City Hall has been in operation since October — but local residents and dignitaries got an up-close view of the digs during a Nov. 27 open house and ribbon-cutting ceremony.

At 19,000 square feet, the $6.2 million building represents a major upgrade to the former City Hall facility, which was 11,000 square feet and was built in the 1950s.

The new $6.2 million Zephyrhills City Hall is more than 19,000 square feet. The two-story building is located at 5335 Eighth St. (Kevin Weiss)

The two-story building, at 5335 Eighth St., has a modernized brick and stone exterior, and is accented with a fountain and courtyard plaza.

The interior has a similar majestic feel.

On the whole, the new City Hall features more open workspaces and multifunctional meeting rooms, which can flexibly be used to accommodate public events.

The first floor is spotlighted by its sizable council chambers — outfitted with high ceilings, large windows and modern decor. It seats up to 80 people and is equipped with large flat-screen televisions to help attendees see presentations.

Also on the first floor, is a large main lobby and a sizable reception area, for those waiting to meet with the city’s utility, building and planning departments.

Much of the second floor features administration and IT office spaces, as well as a conference room and break room. Several of the second floor spaces are double-door rooms, which may later be converted to more offices as the city grows.

Technology is another a significant feature in the facility. It has automatic lighting and upgraded thermostats, as well as security cameras and access-control keypads. Meeting rooms are equipped with Smart TVs that are integrated with office computers for greater efficiency and planning purposes.

Multiple restrooms, stairwells and an elevator are some other noted features.

City officials expressed excitement about the City Hall during the open house event.

The new Zephyrhills City Hall was christened with a Nov. 27 open house and ribbon-cutting ceremony.

“This is a beautiful facility,” Zephyrhills Mayor Gene Whitfield said. “The first thing I thought of when I came in after it was finished was, ‘Wow!’”

He added: “We’re very proud of it and very proud we could do this for our citizens. It’s their building. It fits our community, and we’re really proud of that and we’re proud to have the honor of serving the community.”

Zephyrhills City Council president Lance Smith was enthusiastic about the building, too. He noted the former City Hall felt “kind of like a dungeon.”

“It was well past time we needed this new building,” Smith said. “It’s just a beautiful building, and I think that’s what a public structure should be — it should be something that everybody’s proud of and it’s to be used by the community.”

Smith also took time to encourage more residents to utilize the council chambers to host meetings, events and other activities. “I just want everybody to use this. …Instead of being used once every two weeks, I want to see that thing used,” he said.

Fellow City Council member Jodi Wilkeson expressed these sentiments, regarding the new City Hall: “I believe in my heart that the people who hold this city together — the workers— they deserve a structure like this, as do the citizens of our community.”

The City Hall project was designed and built by Harvard Jolly and A.D. Morgan.

It took more than a year to build the facility after the old City Hall was demolished last September. During construction, Zephyrhills staffers worked from the city’s old police station on Ninth Street, while City Council meetings were held at the Zephyrhills Public Library.

Assistant City Clerk Jessica Carter remembers her co-workers being elated to finally move into the new City Hall on Oct. 8.

“That was a day we were all looking forward to. We didn’t mind coming into work that Monday,” Carter said with a chuckle.

Though pleased with the entire facility, Carter noted the break room, of course, is a favorite among city employees, herself included.

Said Carter: “It’s a happening place; lots of counter spaces.

“I don’t know if anybody saw the old City Hall, but our break room was more like a closet with a refrigerator, so this is definitely a huge upgrade,” she added.

The new building is still undergoing a few final finishing touches, according to Public Works Director Shane LeBlanc. Those include correcting minor painting flaws, window treatments and other punch list items. Work is also being done on the courtyard fountain and an additional parking lot, which is expected to be finished by January.

Published December 5, 2018

Share this:

  • Tweet
  • Click to share on Reddit (Opens in new window) Reddit
  • Share on Tumblr
  • Click to email a link to a friend (Opens in new window) Email
  • Click to print (Opens in new window) Print

Like this:

Like Loading...

Reader Interactions

Leave a Reply Cancel reply

You must be logged in to post a comment.

Primary Sidebar

Search

Sponsored Content

All-in-one dental implant center

June 3, 2024 By advert

  … [Read More...] about All-in-one dental implant center

WAVE Wellness Center — Tampa Bay’s Most Advanced Upper Cervical Spinal Care

April 8, 2024 By Mary Rathman

Tampa Bay welcomes WAVE Wellness Center, a state-of-the-art spinal care clinic founded by Dr. Ryan LaChance. WAVE … [Read More...] about WAVE Wellness Center — Tampa Bay’s Most Advanced Upper Cervical Spinal Care

More Posts from this Category

Archives

 

 

Where to pick up The Laker and Lutz News

Copyright © 2025 Community News Publications Inc.

   
%d