• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • About Us
  • Videos
    • Featured Video
    • Foodie Friday
    • Monthly ReCap
  • Online E-Editions
    • 2025
    • 2024
    • 2023
    • 2022
    • 2021
    • 2020
    • 2019
    • 2018
    • 2017
    • 2016
    • 2015
    • 2014
  • Social Media
    • Facebook
    • Twitter
    • Instagram
  • Advertising
  • Local Jobs
  • Puzzles & Games
  • Circulation Request

The Laker/Lutz News

Serving Pasco since 1981/Serving Lutz since 1964

  • Home
  • News
    • Land O’ Lakes
    • Lutz
    • Wesley Chapel/New Tampa
    • Zephyrhills/East Pasco
    • Business Digest
    • Senior Parks
    • Nature Notes
    • Featured Stories
    • Photos of the Week
    • Reasons To Smile
  • Sports
    • Land O’ Lakes
    • Lutz
    • Wesley Chapel/New Tampa
    • Zephyrhills and East Pasco
    • Check This Out
  • Education
  • Pets/Wildlife
  • Health
    • Health Events
    • Health News
  • What’s Happening
  • Sponsored Content
    • Closer Look
  • Homes
  • Obits
  • Public Notices
    • Browse Notices
    • Place Notices

Pasco Animal Services to get cooling, heating upgrade

February 9, 2021 By B.C. Manion

The Pasco County Commission is moving ahead with a project to upgrade the heating, ventilation and air conditioning system at its Animal Services’ Adoption Center.

Commissioners approved a staff recommendation to proceed with a project design, and build a heating, ventilation and air conditioning upgrade for the Adoption Center, for a cost not to exceed $506,190. The agreement calls for utilizing Omnia Partners, with Daikin Applied Americas Inc.

The Adoption Center consumes more energy per square foot than any other county building, according to the board’s Jan. 26 agenda background materials.

The building currently averages an annual electric bill over $160,000 per year, the agenda materials say, and the installation of three new energy-saving HVAC units would save approximately $90,000 annually.

Using Omnia would allow for standardization with current systems already installed throughout the county, the agenda materials said.

In other action, commissioners allocated $40,000 to help pay for amenities at the intersection of the Starkey and Suncoast trails.

The primary source of support for the project is a $160,000 grant from a Florida Department of Environmental Protection (FDEP) recreational trail program grant. Pasco County also set aside an additional $10,000, for possible cost overruns.

The money will be used to add a restroom with a composting toilet, an ADA hard-surface access trail, a well/water fountain, a bike repair station, a solar charging station, a bike rack, a wayfinding locator, and a kiosk with trail use/trail safety educational literature.

In another action, commissioners approved the purchase of 1.09 wetlands mitigation credits in the amount of $131,100 from North Tampa Mitigation LLC.

The credits are needed to offset additional wetlands impacts for the Wesley Chapel Boulevard (County Road 54) widening project, from north of State Road 56 to north of Magnolia Boulevard, according to the agenda backup.

As part of finalizing the design plans for the C.R. 54 (Wesley Chapel Boulevard) widening project

from north of S.R. 56 to north of Magnolia Boulevard, two stormwater management facilities located at the south end of the project needed to be reconfigured and relocated. In addition, a right-turn lane was added on northbound Wesley Chapel Boulevard, 54 at Compark Drive to replace the existing right-turn lane.

These design changes resulted in additional wetland impacts, which need to be mitigated in order for the U.S. Army Corps of Engineers (USACE) to approve the county’s permit modification application.

On another issue, commissioners approved a resolution requesting the Pasco County Legislative Delegation to sponsor and support a local bill that would support a Net Metering Program in Pasco County.

At the end of 2024, Pasco County’s energy contract with Duke Energy (Duke) will expire. Presently the sale of renewable electricity supplied by the Waste To Energy (WTE) Facility accounts for approximately 40% of the solid waste department’s enterprise fund’s annual revenue, according to a county documents contained in the board’s agenda materials.

Under Duke’s currently available standard offer contract, the county’s annual electrical revenue would decrease by over $22 million, the document says.

If the proposed local bill is adopted, Pasco County would be able to realize fair market value for the renewable electrical energy that it is already generating.

Published February 10, 2021

Share this:

  • Tweet
  • Click to share on Reddit (Opens in new window) Reddit
  • Share on Tumblr
  • Click to email a link to a friend (Opens in new window) Email
  • Click to print (Opens in new window) Print

Like this:

Like Loading...

Reader Interactions

Leave a Reply Cancel reply

You must be logged in to post a comment.

Primary Sidebar

Search

Sponsored Content

All-in-one dental implant center

June 3, 2024 By advert

  … [Read More...] about All-in-one dental implant center

WAVE Wellness Center — Tampa Bay’s Most Advanced Upper Cervical Spinal Care

April 8, 2024 By Mary Rathman

Tampa Bay welcomes WAVE Wellness Center, a state-of-the-art spinal care clinic founded by Dr. Ryan LaChance. WAVE … [Read More...] about WAVE Wellness Center — Tampa Bay’s Most Advanced Upper Cervical Spinal Care

More Posts from this Category

Archives

 

 

Where to pick up The Laker and Lutz News

Copyright © 2025 Community News Publications Inc.

   
%d